Main page › Guides › Supply-only vs turnkey
Supply-only vs turnkey prefab contracts
| Supply-only | The seller provides parts or modules; construction and site work sit with someone else |
|---|---|
| Turnkey | No legal definition; scope is whatever the contract lists |
| Queensland kit homes | Owner-builder permit at A$11,000 or more, plus a QBCC-licensed builder to coordinate[1] |
| Supplier duties (Qld) | Deliver on time, describe parts honestly, supply what was paid for[2] |
| Victoria | Major domestic building contract: more than one trade and over A$10,000; registered builders only[3] |
A prefab quote can look like a single product but be one of two different contracts. A supply-only arrangement sells the building components or modules and leaves construction, installation or site work to others. A turnkey arrangement is sold as one package taken through to a finished home. The names describe a commercial pitch, not a legal category, so the real boundary is the list of inclusions and exclusions in each contract.
How the two scopes differ §
| Feature | Supply-only | Turnkey |
|---|---|---|
| What is sold | Parts, kit or modules | Finished home package |
| Who builds | Others, arranged separately | The contracting builder |
| Who coordinates | Often the owner | The builder |
| Legal definition | None in sources compiled | None in sources compiled |
The table shows the usual commercial meaning, not a rule. Because neither term is defined in the government pages compiled here, two contracts using the same word can differ widely. The Queensland and Victorian pages used for this guide do not themselves use the phrase "supply-only".[1][2][3] For where the word "turnkey" tends to stop in practice, see what turnkey includes.
Who carries the coordination role §
The Queensland Government's kit home pages show how roles split when a buyer purchases parts rather than a finished home. An owner-builder acts as head contractor, making contracts with subcontractors and suppliers and being bound to pay them on time. An owner who is not a builder instead contracts with a coordinating builder, who engages and pays the subcontractors and suppliers.[2] Those two descriptions line up broadly with a supply-only path (owner coordinates) and a package path (builder coordinates), although the page does not label them that way.
Licensing and permits in Queensland §
For kit homes on the owner's land, Queensland's page states that work costing A$11,000 or more including GST needs both an owner-builder permit and a QBCC-licensed builder to coordinate, and describes the work as unlawful without them.[1] The value counted is what a licensed contractor would charge, labour and materials together, even where the owner supplies some labour.[1] That is a rule about the building work, not about the supply contract, and it is stated for kit homes and sheds. Whether it applies to a factory-built module delivered and craned onto a site is not covered by sources compiled here. Wider owner-builder thresholds are in kit homes and the owner-builder route.
Duties of a parts supplier in Queensland §
The same Queensland page sets out duties for the seller of parts. The supplier must deliver on time or, where no date is agreed, within a reasonable time; must not accept payment when it knew or should have known it could not supply; must be honest about price, grade and composition; and must deliver what the buyer paid for.[2] Complaints about delays or mismatches go to the Office of Fair Trading, while complaints about a builder go to QBCC dispute resolution.[2] A builder under the package route must hold a QBCC licence, meet a reasonable standard of work, complete it and provide a Certificate of Insurance.[2]
Contract thresholds in Victoria §
Consumer Affairs Victoria states that a major domestic building contract is needed before work starts where more than one trade is involved and the cost is over A$10,000, and that only registered builders can enter such contracts.[3] A job limited to a single trade generally does not need one, though a written contract is recommended.[3] The page does not address a contract for materials only, so whether a Victorian supply-only prefab contract falls inside or outside that regime is not covered by sources compiled here. Reforms to Victorian progress payment limits are covered in Victoria's progress payment reform.
Payments, insurance and standard forms §
Under Queensland's description, a builder in the package route may take a small deposit but cannot require full payment up front, and payments can be staged as work finishes.[2] Payment practice for factory builds, where much of the value is created before site work starts, is in progress payments for off-site construction. Who is covered if a builder fails, and which scheme applies, is in building insurance and warranty schemes by state and what happens if your builder becomes insolvent. The industry-body form of contract is described in the prefabAUS standard form contract.
What is not covered here §
This page does not give the legal definition of supply-only or turnkey contracts in any state, because none was found in the sources compiled. It covers Queensland and Victoria only; New South Wales, Western Australia, South Australia, Tasmania, the ACT and the Northern Territory are not covered by sources compiled here, and one state's rule is not assumed to apply in another.
It does not establish whether a supply-only sale of modules to a buyer, or a contract where the buyer separately hires a builder for installation, is a regulated domestic building contract, or whether statutory home warranty cover attaches to it. It does not compare prices between the two routes, and no builder price data is used. It does not review the text of any specific contract.
Nothing here is legal advice. The classification of a particular contract is a matter for the relevant state regulator or a lawyer.
Ask Modular Living AI about this guide
Still have a question after reading this guide? Ask it here. The answer draws on this guide, our other guides and the official pages they cite, with links to each one it used.
General information only, not legal, financial or building advice.
Sent to info@modularlivingaustralia.com.au and handled by a person. See Privacy.
References §
- Queensland Government — Kit home construction — Kit homes and sheds are generally for owner-builders. Building work on own land under A$11,000 including GST needs no permit; at A$11,000 or more an owner-builder permit and a QBCC-licensed builder to coordinate are needed, and the work is otherwise described as unlawful. Project value is what a licensed contractor would charge, even if the owner does some labour. The page suggests asking about inclusions, delivery, whether materials must be cut on site, slab responsibility and site works. It does not describe contract terms or use the terms supply-only or supply-and-erect. qld.gov.au/law/your-rights/consumer-rights-complaints-and-scams/buying-products-and-services/buying-products/kit-homes/kit-home-construction
- Queensland Government — Rights and responsibilities for kit homes and sheds — Suppliers must deliver parts on time (or within a reasonable time if no date is set), must not take payment knowing they cannot supply, must be honest about price, quality and composition, and must supply what was paid for; complaints go to the Office of Fair Trading. Builders need a QBCC licence, must meet a reasonable standard, complete the work and give a Certificate of Insurance. Owner-builders act as head contractor with subcontractors and suppliers; owner non-builders contract with the coordinating builder, who may take a small deposit but cannot demand full payment upfront. Does not use the terms supply-only or supply-and-erect. qld.gov.au/law/your-rights/consumer-rights-complaints-and-scams/buying-products-and-services/buying-products/kit-homes/rights-and-responsibilities-for-kit-homes
- Consumer Affairs Victoria — Building contracts — A major domestic building contract is needed before work starts where the job involves more than one trade and costs over A$10,000; only registered builders can enter into one. Single-trade jobs generally do not need one, but a written contract is recommended. Refers to the Domestic Building Contracts Act 1995. For work up to A$10,000 the page lists contents such as plans, specifications, fittings by make and model and who supplies them, variations, insurances and cancellation terms. Does not address supply of materials only. consumer.vic.gov.au/housing-and-accommodation/building-and-renovating/plan-and-manage-your-building-project/contracts
Figures are as published by the sources above at their respective dates and are paraphrased summaries, not verbatim reproductions. Verify current pricing and rules directly with builders, lenders and planning authorities.