Modular LivingAustralia

Main page › Guides › Interstate licensing

Licensing for interstate prefab manufacturers

Status: the NSW and Victorian prefabrication provisions have been passed but are not yet in force; the rules described as current apply until they commence.[1][2] The NSW manufacturer-licensing model quoted here comes from a 2024 consultation paper and is not final law.[3] General information only, not legal advice.
Licensing at a glance
Licences are state-basedEach state and territory licenses building work separately; there is no national builder licence
Interstate recognitionAutomatic mutual recognition covers individuals, not companies, and Queensland does not take part[4][5]
Western AustraliaProducing a prefabricated building in a manufacturing yard is exempt from builder registration; on-site assembly is tested separately[6]
NSW (proposed)A manufacturing-only licence class (Builder E) was floated in 2024; not final[3]
Victoria (passed)A registered prefabrication builder category, not yet in force[2]

A factory in one state supplying homes to another sits across two licensing systems. There is no national builder licence: each state and territory licenses building work itself, so the question is which state's rules reach the factory work, and which reach the work on the site. This guide sets out what the sources compiled here say, state by state, and how the roles of manufacturer and builder are being separated in law.

Licensing is by state, and recognition is limited §

Under automatic mutual recognition (AMR), a person licensed in a participating state can work in another under the home licence, without a second licence. It has limits that matter for factories:

FeaturePositionSource
Who is coveredIndividuals, not companies (Victoria)BPC[5]
QueenslandDoes not participateNSW, BPC[4][5]
Before starting workNotify the host regulatorNSW, BPC[4][5]
Design practitionersNot eligible in NSWNSW[4]

Victoria's regulator lists NSW, Tasmania, South Australia, the ACT, the Northern Territory and Western Australia as participating, and says companies holding building or plumbing accreditation cannot use AMR.[5] Its page does not mention domestic builders specifically, so whether a given builder class is covered is not established by these sources.[5] In NSW, a company or partnership licence can nominate an interstate supervisor, who then carries NSW obligations as if licensed under the Home Building Act 1989.[4] Home-state licence conditions still apply and local law must be followed.[4]

In practice a business is a company, so AMR's focus on individuals leaves open how a factory entity is treated; the sources do not resolve that.

Factory work versus site work §

The same prefab home involves two kinds of work, and the sources treat them differently.

Factory work. Western Australia says producing a prefabricated or transportable building in a manufacturing yard is exempt from builder registration.[6] That statement concerns work done in a yard; the page does not address interstate businesses.[6] For Queensland, the regulator's licence page sets a $3,300 value threshold for building work but does not address off-site or prefabricated work.[7] NSW's page on prefabricated additions covers erection only and does not say whether a manufacturing-only business needs a licence.[8]

Site work. Placing and securing the home is treated as building work. In Western Australia, assembling, reassembling or securing a relocated building is building work that can need a permit, and registration depends on the permit, the $20,000 value test and the prescribed area.[6] Where a permit is needed, a registered builder or approved owner-builder must install a habitable building valued over $20,000, and the builder named on the permit is responsible for the completed building meeting building standards.[9] In NSW, a licence is needed for building work over $5,000, and a prefabricated secondary dwelling needs a general building licence.[8]

Electrical and plumbing work stays with licensed tradespeople regardless of where it is done. How that plays out for factory-installed services is in electrical work in factory-built homes and plumbing in factory-built homes.

Who is responsible: manufacturer or builder §

Under current rules in the states covered above, responsibility for the finished building attaches to the licensed builder named on the permit, not to the factory.[9] Why this matters for buyers is covered in checking a prefab builder's licence and insurance.

The passed legislation begins to separate the two roles.

Manufacturers based outside the state §

The 2024 NSW paper addressed out-of-state factories directly. It proposed that where an Australian licensed builder does the work within their licence scope, that builder meets the compliance declaration requirements; where none is involved, the manufacturer would engage an Australian licensed builder to oversee the work and declare NCC compliance before installation in NSW. Out-of-state designs would still need a design compliance declaration, and specialist trades such as electricians would keep their own licences.[3] These were proposals in a consultation paper; the final regulations are still to be made. See the NSW framework for the current position.

A voluntary national certification scheme is also being developed; see the ABCB consultation. It is a different thing from a state licence.

What is not covered here §

Licensing rules for manufacturing-only businesses in Queensland, Victoria (current law), South Australia, Tasmania, the ACT and the Northern Territory are not covered by sources compiled here, nor is whether Western Australia's yard exemption applies to a factory located in another state. How AMR applies to company licences, and to each domestic builder class, is not established by these sources. The NSW regulations and the Victorian regulations that will set licence classes and qualifications are not yet made, as far as the compiled sources show. Trade licensing for electricians and plumbers is covered only at the level of the linked guides. The full text of the NSW 2024 position paper beyond its first 100,000 characters was not read.

This guide describes rules and does not apply them to any business. It is not legal advice; the relevant state regulator is the authority.

Ask Modular Living AI about this guide

Still have a question after reading this guide? Ask it here. The answer draws on this guide, our other guides and the official pages they cite, with links to each one it used.

General information only, not legal, financial or building advice.

The Dispatch — a monthly email when new guides are published. No noise; unsubscribe anytime.

Sent to info@modularlivingaustralia.com.au and handled by a person. See Privacy.

References §

  1. Parliament of New South Wales — Building (Approvals and Practitioners) Bill 2026 — Bill record: assent on 14 August 2026 as Act No 26 of 2026; the Act otherwise commences on a day or days appointed by proclamation. As recorded on the site's guide factory-built-home-inspections-and-certification; the bill page itself could not be re-opened when this guide was written. parliament.nsw.gov.au/parliamentary-business/bills/bill-details?billId=18895&ref=1849
  2. Victorian Legislation — Consumer Legislation Amendment Bill 2026 — Bill record: assented 8 September 2026 as Act No 36/2026; Building Act 1993 amendments dealing with prefabrication work and prefabrication builders were agreed during passage. As recorded on the site's guide factory-built-home-inspections-and-certification; the page itself could not be re-opened when this guide was written. Commencement of the prefabrication provisions is described there from trade commentary, not the Act. legislation.vic.gov.au/bills/consumer-legislation-amendment-bill-2026
  3. Building Commission NSW — Position Paper: Regulation of Prefabricated Buildings (August 2024, consultation draft) — Consultation paper tied to a draft 2024 Building Bill, stating it does not reflect final Government positions. Proposes that prefabricated builders hold a building licence with a nominee practitioner, via two options: a standard Builder A to C licence where the manufacturer also installs on site, or a dedicated Builder E class for off-site building and transport only, with all on-site installation by a separate Builder A to C licensee. For work done outside NSW, an Australian licensed builder working within scope must meet compliance declaration requirements, or the manufacturer must engage one to oversee the work and declare NCC compliance before NSW installation. Out-of-state designs still need a design compliance declaration. Specialist trades such as electricians keep their own licences. Only the first 100,000 characters of the paper were read. architecture.com.au/wp-content/uploads/Building-Commission-NSW-Position-Paper-–-Regulation-of-Prefabricated-Buildings.pdf
  4. NSW Government — Working interstate and mutual recognition — Interstate licence holders can work in NSW under their home licence under automatic mutual recognition (AMR) with no NSW licence fee, provided the licence is current for the work. Queensland does not participate, so Queensland and NSW licensees cannot use AMR in each other's state. Home-state licence conditions continue to apply and NSW law must be followed. Company or partnership licences can nominate an interstate supervisor who then carries NSW obligations under the Home Building Act 1989. Design and building practitioners are not eligible for AMR and must register under the NSW Design and Building Practitioners scheme. Notification to Building Commission NSW is required before starting work. nsw.gov.au/business-and-economy/licences-and-credentials/building-and-trade/working-interstate-and-mutual-recognition
  5. Building and Plumbing Commission (Victoria) — Automatic mutual recognition — AMR in Victoria applies to individuals, not companies, who hold a current substantive registration or licence in a participating home state or territory (NSW, Tasmania, South Australia, ACT, Northern Territory, Western Australia). Queensland registrants are not eligible and Victorian practitioners cannot use AMR in Queensland. Building surveyors, some plumbing classes and companies holding building or plumbing accreditation are excluded. Practitioners must notify the commission online before working in Victoria and show evidence of required Victorian insurance. The page does not mention domestic builders specifically. bpc.vic.gov.au/builders/registration/automatic-mutual-recognition
  6. Government of Western Australia, Building and Energy — Do I need to be a registered builder? — Builder registration is generally required where a building permit is needed, the work is worth $20,000 or more, and it is in the prescribed area of WA. Producing a prefabricated or transportable building in a manufacturing yard is exempt from registration; assembling, reassembling or securing a relocated building is building work that can require a permit and is tested against the three criteria. The page does not address interstate businesses. wa.gov.au/system/files/2025-08/do_i_need_to_be_a_registered_builder.pdf
  7. Queensland Building and Construction Commission — Who must hold a QBCC licence — Building work worth more than $3,300 needs a QBCC licence, and certain work such as plumbing and drainage always needs one regardless of value. The page does not address off-site or prefabricated work or licences issued interstate. qbcc.qld.gov.au/home-owner-hub/build-renovate/finding-contractor-getting-quotes/who-must-hold-qbcc-licence
  8. NSW Government — Erection of prefabricated metal-framed home additions and structures — Under the Home Building Act 1989 a contractor licence is needed to contract for, advertise or carry out building or trade work over $5,000 in labour and materials including GST. The page states that this licence category does not cover prefabricated secondary dwellings such as granny flats, which need a general building licence. It covers erection only and does not address manufacture. nsw.gov.au/business-and-economy/licences-and-credentials/building-and-trade-licences-and-registrations/prefabricated-additions-and-structures
  9. Government of Western Australia — Consumers urged to do groundwork on DIY prefabricated pods and buildings (21 July 2026) — A prefabricated structure used as or in a building will often need a building permit, with no specific exemption for prefabricated buildings. Where a permit is required, installation must be by a registered builder or approved owner-builder if a habitable building is valued over $20,000. The builder named on the permit is responsible for the completed building meeting building standards, and electrical and plumbing work must be done by licensed tradespeople. The page does not address products made interstate or overseas. wa.gov.au/government/announcements/consumers-urged-do-groundwork-diy-prefabricated-pods-and-buildings

Figures are as published by the sources above at their respective dates and are paraphrased summaries, not verbatim reproductions. Verify current pricing and rules directly with builders, lenders and planning authorities.