Main page › Guides › Modular supplier panels
Government modular supplier panels by state
| NSW | SCM5862 Modern Methods of Construction Procurement List, open until 1 May 2027[1] |
|---|---|
| Queensland | QBuild names 11 manufacturing suppliers for its MMC program[2] |
| Western Australia | Six builders announced for a State-wide modular build panel in May 2022[3] |
| Northern Territory | Southern Region modular housing panel, 10 contractors, awarded 19 February 2025[4] |
| Not found | No modular-specific panel found on official Victorian, South Australian or ACT pages reviewed |
This guide is for prefab and modular manufacturers, builders and suppliers who want to know which Australian governments keep a standing panel or list of modular housing suppliers, and for developers and community housing providers who want to see who a government has already approved. For each state and territory it records the panel or list name, the agency, whether members are officially published, whether new entrants can join, and the portal used. The general procurement rules (thresholds, prequalification schemes) are covered separately in selling prefab to government and are not repeated here.
A panel is a pre-approved pool of suppliers that an agency can go back to for work over a set period, without running a full open tender each time. Being on one does not guarantee any work. The sources compiled here show that only some jurisdictions run panels specific to modular housing, and only some publish who is on them.
Supplier lists currently open for applications, and invited tenders issued to panel members, are tracked on the prefab tenders and bids page.
At a glance §
| Jurisdiction | Panel or list (agency) | Members published? |
|---|---|---|
| NSW | SCM5862 MMC Procurement List (Department of Communities and Justice, for Homes NSW)[1] | No; buyers log in to see suppliers[1] |
| Victoria | None found[5] | Not applicable |
| Queensland | MMC program manufacturing partners (QBuild)[2] | Yes, 11 names on the program page[2] |
| Western Australia | State-wide modular build panel (Department of Housing and Works)[3][6] | Six names in a 2022 statement; current list on Tenders WA[3][6] |
| South Australia | No modular-specific panel found; general Builders Panel (Renewal SA)[7] | Not in full[7] |
| Tasmania | ModHomes program suppliers (Homes Tasmania)[8] | Yes, three named suppliers[8] |
| ACT | None found[9] | Not applicable |
| Northern Territory | Southern Region modular housing panel (Department of Logistics and Infrastructure)[4] | Yes, 10 awarded contractors[4] |
"None found" means no official page reviewed for this guide described a modular-specific panel. It does not prove that none exists.
New South Wales §
Name and agency. NSW runs the SCM5862 Modern Methods of Construction Procurement List, a whole-of-government list valid from 2 May 2024 to 1 May 2027. It is managed by the Department of Communities and Justice, with procurement enquiries handled by Homes NSW.[1]
What it covers. The list covers factory-made 3D volumetric or modular structural systems, 2D kit-of-parts systems, 3D printing and non-structural assemblies. It excludes construction-only works, site productivity technology and design or project management services.[1] According to Homes NSW, the list is the pool it draws on when looking for firms able to build homes with these methods.[10]
Members. The public page does not name suppliers. It tells buyers to log in to find suppliers on the list.[1]
New entrants. The list is open. Any organisation with an ABN, Australian or overseas, that meets the conditions of participation can apply through a buy.nsw supplier account, and the page says a decision is emailed within four weeks.[1] Homes NSW says suppliers can apply at any time until 1 May 2027, and that firms already on other construction schemes must still apply to this list.[10]
Portal. Applications go through buy.nsw. Homes NSW says open opportunities, including requests for tender, are posted on the Buy NSW Opportunities Hub.[10]
Victoria §
No Victorian Government panel or list specific to modular or prefabricated housing was found in the official sources reviewed. The Tenders VIC portal points to the Construction Supplier Register, which is a general prequalification scheme for construction works and services, not a modular panel.[5] Who that register covers is set out in selling prefab to government.
Victoria's prefab industry directory is a promotional listing, not a procurement panel; it is described in how to find prefab manufacturers. Panels run by individual Victorian agencies (for example, for school buildings) are not covered by sources compiled here.
Queensland §
Name and agency. QBuild, the Queensland Government's building agency, runs a Modern Methods of Construction Program. Homes are made by QBuild tradespeople and apprentices at its Rapid Accommodation and Apprenticeship Centres and by external manufacturers.[2] The official page calls these firms manufacturing partners. It does not use the words panel, preferred supplier list or standing offer arrangement for them.[2]
Members. As listed by QBuild, and not independently verified, the 11 manufacturing partners are Ausco, Fleetwood, Hutchies Modular, Modscape, Blok Modular, Eco Cottages, James Engineering, ModnPods, Saltair Modular, Volo Modular and WestBuilt Homes.[2] The page carries no date. The Cairns factory expansion is covered in the QBuild Cairns guide.
New entrants. The program page said more opportunities for other suppliers would open during 2024.[2] Whether that happened is not covered by sources compiled here. More generally, QBuild asks contractors, consultants and suppliers to complete its registration process.[11]
Portal. Business Queensland says much QBuild purchasing runs through standing offer or preferred supplier arrangements, and that open tenders are advertised on QTenders and/or VendorPanel.[12] It also says registration does not guarantee work.[12] An official page naming an "MMC Preferred Suppliers Panel", or listing its members, was not found in the sources compiled here.
Western Australia §
Name and agency. The Department of Housing and Works runs two State-wide panels: a Housing Construction and Refurbishment Builders Panel and a modular panel, listed on Tenders WA as "Design and Construct Services for Modular Residential Housing State-Wide".[6] Earlier, in November 2021, the then Department of Communities sought registered builders for modular and other prefabricated housing through Tenders WA (DOC9621321 and DOC9616821, both closed on 17 December 2021).[13]
Members. A government media statement of 17 May 2022 named six builders appointed to the State-wide modular build panel. As listed there, and not independently verified, they were Evoke Living Homes (Northam), Fleetwood Building Solutions (High Wycombe), Fox Modular (Gnangara), Modular WA (Wangara), Murray River North (Pinjarra and Maddington) and Quality Builders (Forrestfield).[3] The same statement said other companies were being engaged and the panel could grow.[3] The department's own page, last updated 1 July 2025, says the current lists of appointed builders are held on Tenders WA.[6] Those Tenders WA pages could not be retrieved for this guide, so the current membership is not covered by sources compiled here.
New entrants. The department says any future expansion of the panels will use an expression of interest to pre-qualify new builders, and suggests registering with Tenders WA to hear about open tenders.[6] No date for a next intake is given. It also suggests that other businesses approach builders already on the panels.[6]
Portal. Tenders WA.[6] The role of modular housing in WA's social housing program is covered in government prefab programs by state.
South Australia §
No South Australian Government panel specific to modular or prefabricated housing was found in the official sources reviewed. Renewal SA runs a general Builders Panel, set up in July 2024 through a competitive tender. Fifteen companies were selected on three-year agreements.[7] The article describing it does not present it as a modular panel, and it does not publish the full list of members.[7] The SA Housing Authority's general pre-qualified builders list is covered in selling prefab to government.
Tasmania §
Program and agency. Homes Tasmania runs the ModHomes program, which aims for at least 200 modular social housing units, 50 a year over four years, built on its own land.[8] A media release on the Premier of Tasmania's website in August 2026 reported more than 280 modular homes delivered under ModHomes.[14]
Members. As listed by Homes Tasmania, and not independently verified, the program was awarded to three suppliers: Podmatrix; Davies Design and Construction; and The Bloc Collective working with Platinum Pro Constructions.[8] Homes Tasmania describes this as an award to three suppliers, not as a standing panel.[8]
New entrants and portal. No process for new suppliers to join is stated on the program page.[8] The portal used for the award is not covered by sources compiled here.
Australian Capital Territory §
No ACT Government panel of modular or prefab suppliers was found. At a Legislative Assembly committee hearing on 18 November 2025, an official described the government's prefab housing work: nine precast concrete panel dwellings delivered, a two-dwelling structural insulated panel project in design, a four-dwelling modular project in procurement, and an eight-dwelling low-carbon project under construction and due in mid-2026. The minister's written answer to the related question dealt with Commonwealth prefab funding. Neither mentions a supplier panel.[9]
Northern Territory §
Name and agency. The Department of Logistics and Infrastructure awarded tender T24-1028, a 36-month panel contract to design, build, store, transport, install and certify modular homes in the Southern Region, including remote communities.[4] The tender was released on 30 May 2024, closed on 22 July 2024 and was awarded on 19 February 2025. CAL accreditation was a stated requirement.[4]
Members. As published on NT Tenders Online, and not independently verified, ten contractors were awarded places, with a combined lump sum of A$40 million: M and C Fior Constructions (trading as Bullant Building), NT Link, DJC Build, TAG Modular (trading as DSH Sales), Hawkins and Clements, Murray River North, Northern Transportables, PTM Group, Rusca Developments, and M&J Builders.[4]
Northern Region. A government procurement plan, accurate as of 7 June 2024, listed a modular panel period contract for both the Northern and Southern Regions, each estimated at A$5 million or more.[15] An awarded Northern Region panel is not covered by sources compiled here.
New entrants and portal. NT Tenders Online.[4] No process for joining the Southern Region panel after award is stated.
What is not covered here §
This page does not cover local council panels, Commonwealth agencies, Defence Housing Australia, community housing providers' own supplier lists, or panels for modular classrooms and other non-housing buildings. It does not assess any panel member or recommend any supplier.
Several gaps remain. The current membership of WA's modular panel on Tenders WA, NSW's SCM5862 members (visible only after login), any QBuild "preferred suppliers panel" or standing offer arrangement for modular homes, an awarded NT Northern Region modular panel, and any Victorian, South Australian or ACT modular panel are not covered by sources compiled here. Funding programs that use these panels, such as the Housing Australia Future Fund, are covered in HAFF Round 3 for prefab suppliers.
Ask Modular Living AI about this guide
Still have a question after reading this guide? Ask it here. The answer draws on this guide, our other guides and the official pages they cite, with links to each one it used.
General information only, not legal, financial or building advice.
Sent to info@modularlivingaustralia.com.au and handled by a person. See Privacy.
References §
- NSW Government buy.nsw — SCM5862 Modern Methods of Construction Procurement List — Whole-of-government list, status current, valid 2 May 2024 to 1 May 2027; managed by the Department of Communities and Justice, with a Homes NSW procurement contact. Scope: pre-manufactured 3D volumetric or modular systems, 2D kit-of-parts systems, additive manufacturing and non-structural assemblies; excludes construction-only works, site productivity technology and design or project management services. Any domestic or international organisation with an ABN meeting the conditions of participation can apply through a buy.nsw supplier account; decision emailed within 4 weeks. Buyers log in to find suppliers on the list; names are not shown on the public page. www.info.buy.nsw.gov.au/schemes/modern-methods-of-construction-procurement-list
- Queensland Government (QBuild) — QBuild Modern Methods of Construction Program — Homes are manufactured by QBuild tradespeople and apprentices at Rapid Accommodation and Apprenticeship Centres and by 11 MMC suppliers listed as manufacturing partners: Ausco, Fleetwood, Hutchies Modular, Modscape, Blok Modular, Eco Cottages, James Engineering, ModnPods, Saltair Modular, Volo Modular, WestBuilt Homes. The online enquiry form on the page is for registering interest in the MMC floor plans; the page says further supplier opportunities would become available during 2024. Page undated. housing.qld.gov.au/about/department/business-areas/public-works/qbuild/modern-methods-construction-program
- Western Australian Government media statement — Six WA builders join State-wide panel to bolster Modular Build Program (17 May 2022) — Six builders appointed to the State-wide modular build panel: Evoke Living Homes (Northam); Fleetwood Building Solutions (High Wycombe); Fox Modular (Gnangara); Modular WA (Wangara); Murray River North (Pinjarra and Maddington); Quality Builders (Forrestfield). The government was engaging other companies and the panel could expand further. wa.gov.au/government/media-statements/McGowan%20Labor%20Government/Six-WA-builders-join-State-wide-panel-to-bolster-Modular-Build-Program-20220517
- NT Government Tenders Online — T24-1028 Southern Region panel contract for modular housing — Department of Logistics and Infrastructure. Panel for design, construction, storage, transport, installation and certification of modular dwellings in the Southern Region for 36 months. Released 30 May 2024, closed 22 July 2024, awarded 19 February 2025; CAL accreditation required. Awarded contractors (total A$40 million): M and C Fior Constructions Pty Ltd (Bullant Building), NT Link Pty Ltd, DJC Build Pty Ltd, TAG Modular Pty Ltd (DSH Sales), Hawkins and Clements Pty Ltd as trustee, Murray River North Pty Ltd, Northern Transportables Pty Ltd, PTM Group Pty Ltd, Rusca Developments Pty Ltd, M&J Builders Pty Ltd. tendersonline.nt.gov.au/Tender/ClosedDetails?id=23988
- Buying for Victoria — Tenders VIC — Victorian Government tenders portal; links to the Construction Supplier Register, the whole-of-government prequalification scheme for construction works and services. No modular or prefab panel is described on the page. tenders.vic.gov.au
- Western Australian Department of Housing and Works — Supplying to Housing — Builders can approach appointed builders on the State-wide Builders and Modular Panels; the appointed lists are on Tenders WA under 'Housing Construction and Refurbishment Builders Panel' and 'Design and Construct Services for Modular Residential Housing State-Wide'. Future expansion of the panels will use a similar expression of interest approach to pre-qualify new builders. Advises registering with Tenders WA. Last updated 1 July 2025. wa.gov.au/organisation/department-of-housing-and-works/department-of-housing-and-works-supplying-housing
- Renewal SA — Momentum building for Renewal SA's Builders Panel (1 August 2025) — Builders Panel established in July 2024 through a competitive tender to pre-qualify builders; 15 companies selected on three-year agreements; homes described are townhouses. The article does not describe the panel as modular. renewalsa.sa.gov.au/news/momentum-building-for-renewal-sas-builders-panel
- Homes Tasmania — ModHomes program — Program for at least 200 modular social housing units, 50 a year for four years, on Homes Tasmania land; awarded to three suppliers: Podmatrix, Davies Design and Construction, and The Bloc Collective collaborating with Platinum Pro Constructions. Not described as a panel; no joining process stated. homestasmania.com.au/engage/Construction-Projects/modhomes-program
- ACT Legislative Assembly — Question taken on notice 68, prefabricated and modular homes (annual reports hearing 18 November 2025) — Written answer from the Minister for Homes, Homelessness and New Suburbs covers Commonwealth prefab funding and the ACT's application to the Advancing Prefabricated and Modular Housing round. The attached uncorrected hearing transcript (18 November 2025) records an official describing nine precast concrete panel dwellings delivered, a two-dwelling SIP project in DA design, a four-dwelling modular project in procurement and an eight-dwelling low-carbon project in construction, due mid-2026. No supplier panel is mentioned. parliament.act.gov.au/__data/assets/pdf_file/0004/2992747/SP-QTON-068-Answer-Prefabricated-and-modular-homes-RATTENBURY.PDF
- Homes NSW — Modern methods of construction for social housing — Homes NSW says it will use the SCM5862 list to select potential suppliers, manufacturers and builders able to deliver housing using MMC. Suppliers already on other construction schemes must still apply to this list. The list is open until 1 May 2027 and suppliers can apply at any time; open opportunities are posted on the Buy NSW Opportunities Hub. No suppliers are named. Page published 28 April 2025. nsw.gov.au/departments-and-agencies/homes-nsw/housing-reforms-and-initiatives/mmc-for-social-housing
- Queensland Government (QBuild) — About QBuild — Contractors, consultants and suppliers wanting to work with QBuild complete its registration process; refers to the Prequalification System and to QTenders for upcoming, current, closed and awarded tenders. housing.qld.gov.au/about/department/business-areas/public-works/qbuild/about-qbuild
- Business Queensland — Tenders and quotes for QBuild — Much QBuild purchasing occurs through standing offer or preferred supplier arrangements; all open tenders are advertised on QTenders and/or VendorPanel; low-value quotes are usually requested from a shortlist drawn from the register of local contractors and suppliers; registration does not guarantee work. Last updated 16 January 2025. business.qld.gov.au/industries/building-property-development/building-construction/supply-queensland-government/minor-works-maintenance/tenders-quotes
- Western Australian Government — Modular build tender opportunities (15 November 2021) — The Department of Communities sought registered builders for modular and other prefabricated housing through Tenders WA: DOC9621321 (request for tender, design and construction of modular housing) and DOC9616821 (expression of interest, construct-only and other prefabricated methods); both closed 17 December 2021. wa.gov.au/government/announcements/modular-build-tender-opportunities
- Premier of Tasmania — Modular construction helping us deliver more homes, faster for Tasmanians (17 August 2026) — Reports more than 280 modular homes delivered under ModHomes. A further figure of 271 units is quoted from the housing minister for the state as a whole, not specifically for ModHomes. premier.tas.gov.au/latest-news/2026/august/modular-construction-helping-us-deliver-more-homes,-faster-for-tasmanians
- Northern Territory Government — Housing infrastructure procurement plan — Table accurate as of 7 June 2024 lists a Modular Panel Period Contract for the Northern Regions and another for the Southern Regions under HomeBuild NT, each Tier 5 (A$5 million and greater), with estimated advertising in May 2024 and estimated tender committal in November 2024. dipl.nt.gov.au/industry/future-procurement/housing-infrastructure-procurement-plan
Figures are as published by the sources above at their respective dates and are paraphrased summaries, not verbatim reproductions. Verify current pricing and rules directly with builders, lenders and planning authorities.