Main page › Guides › Approval fees and contributions
Council fees and developer contributions on a second dwelling
| NSW contributions, secondary dwelling | A$0 – A$20,000+[1] |
|---|---|
| NSW section 7.12 threshold | Works above A$100,000[2] |
| Gold Coast, above 80 m² | About A$17,000 – A$24,000[3] |
| VIC building permit levy | Not payable at or below A$10,000[4] |
| VIC levy rate | Cost of works × 0.00128[5] |
| *Contributions are levied on the owner, not the builder, and rarely appear in a build quote. | |
Council charges on a second dwelling are levied on the owner, are not part of a builder's quote, and are set by local plans: one trade directory puts NSW developer contributions on a granny flat at nil to A$20,000 or more, depending on the council, the approval pathway and the contributions plan.[1] On the Gold Coast, a design practice reports that exceeding 80 m² triggers charges of about A$17,000–A$24,000, and in Victoria the building permit levy applies only where the cost of works exceeds A$10,000.[3][4]
Almost every cost guide for a second dwelling stops at the build price. The charges that come from the council do not appear in a builder's quote, are levied on the owner rather than the builder, and in the worst case arrive as a five-figure condition of consent after the design is locked in.
This page sets out what those charges are, where they come from, and the design decisions that trigger them. It does not replace a call to your own council, because the amount is set by a local plan rather than by state law. For the build price itself, see granny flat costs by state and modular home costs.
The three kinds of charge §
Separate them, because they behave differently.
- Application fees
- What the council or private certifier charges to assess the application. Usually scaled to the estimated cost of works, set annually, published in a fee schedule.
- State levies
- Fixed percentages imposed by state law and collected at permit stage. Small, predictable, and unavoidable above a threshold.
- Developer contributions
- A payment toward local infrastructure — roads, drainage, parks — charged because a new dwelling adds demand. This is the one that can run into five figures, and the one nobody budgets for.
New South Wales §
Contributions are levied under the Environmental Planning and Assessment Act 1979 in two forms, and a council cannot charge both on the same development. Section 7.11 applies where development produces a net residential increase — which includes an additional dwelling. Section 7.12, the alternative, is a percentage levy on the cost of works and applies to other development with an estimated construction cost over A$100,000[2].
A secondary dwelling sits squarely inside the first category. One council's published plan states plainly that section 7.11 contributions are typically levied on new residential development including secondary dwellings such as granny flats, and publishes a register of what has actually been charged against individual applications[6].
What it costs depends entirely on which plan covers your land. A commercial guide to Western Sydney puts the range at nil to A$20,000 or more depending on council, approval pathway and contributions plan, and notes that several councils apply reduced or nil contributions to secondary dwellings — but not all of them, and not on every pathway[1].
Two practical points follow.
The pathway can change the number. Contributions can attach to a complying development certificate as well as to a development application[2], so choosing the faster route does not by itself avoid the charge. The approval routes themselves are in granny flat rules in New South Wales.
Plans are replaced. One council adopted a new contributions plan in June 2026 applying to applications lodged from 1 July 2026[2]. A figure someone quoted you last year may no longer be the figure.
Victoria §
Victoria's charges are smaller and more predictable at this scale.
The state building permit levy is not payable where the cost of building work is A$10,000 or less[4], which means it applies to any second dwelling. One council's 2026-27 schedule states the levy is calculated as cost of works multiplied by 0.00128, with council lodgement and application fees charged separately[5]. On a A$180,000 build that levy is a few hundred dollars — worth including, not worth worrying about. A separate Building Reform Levy applies to permit applications submitted from 1 July 2026[4].
The metropolitan planning levy, which attracts a lot of confused search traffic, does not apply here: the threshold is A$1,344,000 of development value for 2026-27[7]. A granny flat does not come close.
What is not uniform in Victoria is council planning application fees and any local development contributions plan. Those are set council by council. See granny flat rules in Victoria and Amendment VC282 for when a planning permit is required at all.
Queensland §
Queensland runs on infrastructure charges rather than contributions plans. Under the Planning Act 2016 each local government must adopt an infrastructure charges resolution setting the rates that apply to assessable development, and most councils do not charge on a granny flat — though not all[8].
Where charges do apply, floor area is usually the trigger, and the step is abrupt rather than gradual.
| Council | Trigger | Published charge |
|---|---|---|
| Gold Coast | Above 80 m² gross floor area | ≈A$17,000 – 24,000[3] |
| Brisbane | Above 50 m² | Full rather than reduced charge[9] |
The design consequence is the whole point. A 65 square metre dwelling is not marginally more expensive than a 49 square metre one in Brisbane; it can attract a five-figure charge the smaller one avoids[9]. On the Gold Coast the same logic applies at 80 square metres[3]. Decide the floor area against the charging threshold before the drawings are finalised, not after — and check the current resolution, because these rates are indexed annually[3].
What this means for a factory-built dwelling §
Nothing about these charges changes because the dwelling was built off site. They attach to the approval, not to the construction method. Two things follow for anyone comparing quotes.
A builder quoting "council approval included" is usually referring to the application fee and the certifier, not to contributions. One Queensland modular builder states explicitly that building and plumbing approval fees are included in its price while a development application for a second dwelling is charged separately — the kind of boundary worth finding in writing. See what "turnkey" actually includes and choosing a prefab builder.
And the charge is a condition of consent, payable before work starts or before occupation depending on the council. It is not a cost you can defer by staging the build.
What is not covered here §
Council fee schedules for South Australia, Western Australia, Tasmania, the ACT and the Northern Territory are not covered by the sources compiled here, and no attempt is made to infer them from the eastern states. No national dataset of what secondary dwellings are actually charged has been located; the ranges above come from individual council plans and from commercial guides. Water authority headworks charges, long service levies, and the fees charged by private certifiers are separate again and are not quantified here. Every figure on this page is tied to a specific council and financial year — confirm yours against the current published schedule.
For application fees and state levies on a new main dwelling in every state and territory, see approval fees and levies by state.
Ask Modular Living AI about this guide
Still have a question after reading this guide? Ask it here. The answer draws on this guide, our other guides and the official pages they cite, with links to each one it used.
General information only, not legal, financial or building advice.
Sent to info@modularlivingaustralia.com.au and handled by a person. See Privacy.
References §
- Western Sydney Trades — Commercial trade directory, granny flat cost guide, July 2026. States that section 7.11 or 7.12 developer contributions on a NSW granny flat range from nil to A$20,000 or more depending on the council, the approval pathway and the contributions plan applying to the land, that several Western Sydney councils apply reduced or nil contributions to secondary dwellings but not all and not on every pathway, and that the charge falls on the owner rather than the builder. westernsydneytrades.com.au/granny-flat-cost/
- Sutherland Shire Council — NSW council contributions page. States that section 7.11 applies to development resulting in a net residential population increase, including development that increases the number of dwellings; that section 7.12 applies to other development with an estimated construction cost over A$100,000; and that a council cannot impose both a section 7.11 and a section 7.12 charge on the same development. Records a new local infrastructure contributions plan adopted 22 June 2026, commencing 1 July 2026 and applying to development applications and complying development certificates lodged on or after that date. sutherlandshire.nsw.gov.au/plan-and-build/Planning-considerations/development-contributions-plans
- Design Science — Queensland building design practice, Gold Coast secondary dwelling guide, 2026. States the maximum secondary dwelling size on the Gold Coast is 80 m² gross floor area, that council may approve up to 120 m² with justification, and that exceeding 80 m² triggers infrastructure charges of approximately A$17,000 to A$24,000, indexed annually, with current figures to be confirmed with council. designscience.com.au/granny-flat-regulations-gold-coast-2026/
- Building and Plumbing Commission (Victoria) — Victorian building regulator, building permit levy calculator, July 2026. States the building permit levy is not payable where the cost of building work is A$10,000 or less, and that a Building Reform Levy applies to building permit number applications submitted in the Building Activity Management System on or after 1 July 2026. bpc.vic.gov.au/building-surveyors/permits/calculators
- Knox City Council — Victorian council building fee schedule, current 1 July 2026 to 30 June 2027. States the state government building permit levy is payable where the cost of works exceeds A$10,000 and is calculated as cost of works multiplied by 0.00128, GST not applicable, and sets out separate council lodgement and application fees. knox.vic.gov.au/building-fees
- Kempsey Shire Council — NSW council section 7.11 plans and register. States that contributions under section 7.11 of the Environmental Planning and Assessment Act 1979 are typically levied on new residential and employment-generating development, including new dwellings, secondary dwellings such as granny flats, residential flat buildings and subdivisions, and publishes a register of contributions actually charged against individual development applications. kempsey.nsw.gov.au/Plan-Build/Local-planning-zoning/Developer-Contributions/Developer-contribution-plans-and-registers/Section-7.11-plans-and-registers
- Yarra City Council — Victorian council planning fee page, 2026-27. States the metropolitan planning levy threshold is A$1,344,000 for the 2026-27 financial year, adjusted by CPI on 1 July each year, that the levy is set at A$1.30 per A$1,000 or 0.13 per cent of development value, and that it must be paid to the State Revenue Office before a planning permit application is lodged. yarracity.vic.gov.au/planning-and-building/planning-permits/apply-planning-permit/planning-applications-and-subdivision-fees
- Steffan Harries — Queensland town planning practice, infrastructure charges resource. States that under the Planning Act 2016 each local government area must have an Adopted Infrastructure Charges Resolution listing the charge rates applicable to assessable development, and that most Queensland councils do not charge infrastructure contributions on a granny flat, with named exceptions. steffanharries.au/resources/development-applications/infrastructure-charges/
- Draftee — Architectural drafting firm, Queensland granny flat price guide, 2026. States that Brisbane City Council applies reduced infrastructure charges to secondary dwellings under 50 m² and full charges above that threshold, so that a 65 m² dwelling can attract a five-figure council charge that a 49 m² dwelling does not. draftee.com.au/2-bedroom-granny-flat-prices-queensland/
Figures are as published by the sources above at their respective dates and are paraphrased summaries, not verbatim reproductions. Verify current pricing and rules directly with builders, lenders and planning authorities.